stevenalicearchitects
A boardroom in walnut and black, built in five months.
- Client
- D'Ieteren Immo – Building Design
- Challenge
- Very short timeframe, high level of finish, noble materials, high-tech automation
- Surface
- 110 m² net
- Contractor
- ENGEPAR nv
- Timing
- Design September 2015, handover 15 February 2016
A new boardroom for D'Ieteren with a high level of finish, noble materials and high-tech building automation, all delivered within a very tight timeframe.



stevenalice carried out the complete project under its own name: design, tender documents, construction detailing, site supervision and checking of invoices.




D'Ieteren Boardroom, Brussels — designed by stevenalice architects.
More projects